23 November 2024
BORG EL ARAB REDUCING AND METERING STATION
-
Business Area : RMS
-
Country : Mısır
-
Completion Date : 2020-2021
Station Engineering, Design and Field Control
End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)
-
Project Management
-
Design & Engineering
-
Purchasing
-
Panel Electromontage
-
Field Assembly
-
Testing and Commissioning
-
Schneider Modicon M580 - ePac (Redundant - 220 IO)
-
Communication infrastructure (redundant)
-
Fire detection system (Exproof-nonexproof)
-
Fire extinguishing system (FM200)
-
Design and supply of living containers
-
Redundant UPS (including battery group)
-
Cable supply and connections for instrument and energy feeds
-
Cable tray supply and connections
-
Junction box supply and installation
-
Heat trace supply and installation