21 November 2024
WATERBATH HEATER PROJECT PHASE I
-
Business Area : Gas
-
Country : Egypt
-
Completion Date : 2019
Engineering, Design and Site Supervision of Project
End User: EGYPTIAN NATURAL GAS COMPANY (GASCO)
Time frame: 2018-2019
-
Project Management
-
Design & Engineering
-
Procurement
-
Panel Electrical Assembly
-
Field Installation
-
Test and Commissioning
-
Schneider Freelance Distrubuted Control System (Hybrid DCS)
-
SCADA (Redundant)
-
CPU (Redundant)
-
Communication Infrastructure (redundant)
-
Communication with Fire Detection and Extinguishing
-
Total 248 IO
-
Hot Pluggable IO Modules
-
Process Intruments (level, flow, pressure, temperature, etc.)