Adatech | INDIRECT WATERBATH HEATER FOR BUTIA-450 MW ISO COMBINED CYCLE POWER PLANT

    Continuously
    Perfect Engineering
    (+90) 216 392 14 61
    Clarification Text I've read it. I accept it.
    Adatech | INDIRECT WATERBATH HEATER FOR BUTIA-450 MW ISO COMBINED CYCLE POWER PLANT

    21 November 2024

    INDIRECT WATERBATH HEATER FOR BUTIA-450 MW ISO COMBINED CYCLE POWER PLANT

    • Business Area : Solar Energy

    • Country : Italy

    • Completion Date : 2020-2020

    Station Engineering, Design and Field Control

    End user : ANSELDO ENERGIA

    Time Frame: 2020

    • Project Management

    • Design & Engineering

    • Procurement

    • Panel Electrical Assembly

    • Field Installation

    • Testing and Commissioning

    • Modicon M221/M241 PLC

    • Burner Management System IFD 258

    • Communication Infrastructure

    • Process Instruments

    • Cable supply and connections for instrument and energy supplies

    • Cable tray supply and connections

    • Junction Box supply and connections

    • Heat Trace supply and installation