21 November 2024
İZMİR GAZ ENKA RMS İSTASYONU
-
Business Area : Gas
-
Country : Turkey
-
Completion Date : 202
Engineering, Design and Site Supervision of the Project
End User: İzmir Gaz
Time frame: 2021
-
Project Management
-
Schneider Freelance Distributed Control System (Hybrid DCS)
-
SCADA (Redundant)
-
CPU (Redundant)
-
Communication Infrastructure (redundant)
-
Communication with Fire Detection and Extinguishing
-
Total 300 IO
-
Hot Pluggable IO Modules
-
Process Intruments (level, flow, pressure, temperature, etc.)